A/E
ACM
ADA
Addendum
Agency CM (ACM)
Agent
AIA
Application for Payment
Arbitration
Architect
Architect-Engineer (A/E)
Architect’s Supplemental Instructions (ASI)
As-Built Drawings
Bank Inspector
Beneficial Occupancy
Bid Bond
Bid Documents
Bid Documents
Bonding Company
Budget Analysis
Budget Summary Table
Building Code
Building Envelope
Building Inspector/Official
Building Permit
Change Order
Change Order Proposal
Change Order Proposal (COP)
Change Order Request (COR)
Changed Conditions
Chart of Accounts
Claim
Clerk-of-the-Works
CM
CM Fee Plus Reimbursables
CM Partnering
CM Services
Codes
Commissioning
Constructability
Construction Budget
Construction Change Directive (CCD)
Construction Document Review
Construction Documents
Construction Documents Phase
Construction Management (CM)
Construction Management Contract
Construction Monitor
Construction Schedule
Contingency
Contract Administration
Contract Document Phase
Contract Documents
Contract Performance Bond
Contract Substantial Completion
Contract Sum
Contract Time
Contractor’s Option
Contractor’s Qualification Statement
Cost Breakdown
Cost Codes
Cost of Construction
Cost Plus Fee Agreement
Cost-of-Work
Cost-of-Work
Cost-Plus Contract
Cost-To-Complete
Critical Path
Critical Path Method (CPM)
CSI
CSI Master Format
Daily Construction Report
Date of Agreement
Date of Commencement of the Work
Date of Substantial Completion
Demising Walls
Design Development Phase
Design-Build (D-B)
Design-XCM
Direct Costs
Discretionary Change Order
Division of Work
Engineer
Escrow Account
Estimate of Construction Cost
Estimated Cost-to-Complete
Estimated Final Cost
Extended Services-CM
Fast Track Construction
Feasibility Phase
Fee Enhancement
FF&E
Field Order (FO)
Field Schedule
Field Work Order (FWO)
Final Acceptance
Final Inspection
Financial and Management Control System
Fixed Fee
Fixed Limit of Construction Costs
Float
General Condition Items
General Conditions
General Conditions (of the Contract for Construction)
General Contractor (GC)
Guaranteed Maximum Price-Construction Management (GMP-CM)
Hard Cost Contingency (“HC Contingency”)
Hard Costs
HC Contingency Committed
Independent Contractor
Indirect Costs
International Building Code (IBC)
IRFP
Job-Site Overhead
Joint Venture Partner
K
Labor and Material Payment Bond
Letter of Intent
Lien Release
Lien Waiver
Lien, Mechanic’s or Material
Liquidated Damages (LD’s)
Lump Sum Contract
Lump Sum Fee
Mechanic’s Lien
Meeting Notes
Milestone
Milestone Schedule
Minor Change in Work
Notice of Award
Notice to Proceed
OAC Meeting
Occupancy Phase
Occupancy Schedule
On-Site Supervision
Open Bid
Owner’s Representative (OR)
Owner-Architect Agreement
Owner-Builder
Owner-Construction Agreement
Payment Bond
Pending and Potential Change Orders
Pre-qualification
Preliminary Drawings
Preliminary Lien Notice
Prime Contractor
Professional Engineer
Professional Liability Insurance
Professional Services
Program Schedule
Progress Meeting
Progress Payment
Progress Schedule
Project
Project Budget
Project Completion Graph (S-Curve)
Project Contingency Graph
Project Cost
Project Directory
Project Manager
Project Manual
Project Meeting
Project Site
Project Team
Punch List
Pure CM
Quality Assurance (QA)
Quality Control (QC)
Quality Engineering
Record Drawings
Reimbursable Expense
Reimbursable Expenses (or Costs)
Release of Lien
Resident Architect (RA)
Resident Engineer (RE) (inspector)
RFI
RFP
Safety Report
Schedule of Values
Schematic Design Phase
Scope of Work (SOW)
Shared Savings
Shop Drawings
Soft Costs
Source and Use Budget
Special Conditions
Specifications
Standard Details
Start Date
Statute of Limitations
Stipulated Sum Agreement
Structural Systems
Sub-surface Investigation
Subcontractor
Subcontractor Bond
Substantial Completion
Superstructure
Supplemental Conditions
Surety Company or Surety
T&M
Technical Inspection
Technical Review
Time is of the Essence
Total Project Budget
Transmittal
Travel Time
Underwriter’s Laboratories (UL) Label
Uniform Building Code (UBC)
Unit Prices
Value Engineering
Verbal Quotation
Warranty
Warranty Phase
Work Order (WO)
Working Drawing
XCM
Zoning
zumBrunnen, Inc

image description